特厚煤层迎回采面沿空掘巷区段煤柱宽度研究

Section Coal Pillar Width of Gob Side Entry Driving that Face to Working Face with Extra Thickness Coal Seam

  • 摘要: 以新疆俄矿5104回风巷在5102工作面未回采完毕提前掘进的情况下,出现回风巷迎回采工作面掘巷的问题为例,基于弹性核理论计算了区段煤柱宽度合理范围,运用数值模拟软件FLAC3D采用循环开挖的方式对迎采动掘巷条件下不同宽度煤柱的应力分布和位移进行了对比分析。结果表明:8~20m宽煤柱内应力呈现双驼峰状,4m和6m宽煤柱应力呈现单驼峰状;回风巷顶底板及两帮变形速率在煤柱宽度4~8m区间最大,在8~20m范围趋于平缓。综合考虑煤柱的黏弹塑性流变的时间效应,确定合理煤柱宽度为12m。在此基础上,提出高阻让压、加强底角、重点补强围岩控制技术,现场试验表明:该方案有效地控制了围岩的变形,保证了回采与掘进的正常进行。

     

    Abstract: It taking the problem of return airway driving along direction face to working face,under 5104 return air roadway driving before 5102 working face unfinished mining of E coal mine in Xinjiang district,the rational scope of coal pillar width was calculated by elastic core theory,detailed model was built by software FLAC3D,the stress distribution and displacement of different pillar width were compared under driving along face to working face with cycle excavation.The results showed that the stress shape of pillar width(8~20m)was double humps shape,but the stress shape was like single hump when pillar width were 4m and 6m,respectively.The deformation speed of roof to floor and two sides of return air entry were the largest,when coal pillar width belong scope 4m to 8m,but the speed ratio was smooth when coal pillar width belong scope 8m to 20m.On the basis of time effect of viscoelasto-plastic rheological of pillar,then the reasonable coal pillar width was confirmed as 12m,so the surrounding rock supporting way was put forward,which include high resistance and yield,strengthen bottom corner,reinforcement emphasis and so on,the practical test showed that surrounding rock deformation could be controlled effectively,mining and driving were assured.

     

/

返回文章
返回