Abstract:
This paper introduced wall-slide and roof falling disaster and disposal procedure of air-return roadway when 22303 full-mechanized mining face mined through upper trend coal-pillar.Disaster reason was analyzed.Supporting manner suggestion for two roadways of large-mining-height face under coal-pillar was put forward.By intentionally supporting roof and two-side with logs,additionally supporting with FRP bolts at working side and anchored cable and W-style steel belt at gob-side,wall-slide was controlled,subsidence reduced to 0.5m and gob-side heave reduced to 0.3m,which provided valuable experience for similar condition.