巷道顺向立体交岔点的设计与施工
Design and construction of cisoid solid crossed roadway
-
摘要: 介绍了山东省岱庄生建煤矿巷道顺向立体交岔点—-324上仓胶带巷的支护方式选择和设计,施工工艺等。该巷应用3年多来,虽3次遭受超前压力的影响,但没有明显的矿山压力显现,从而证明这种支护设计的合理性。Abstract: This article introduces the selection of supporting methods, the design and the construction for solid crossed roadway ( 324m belt conveyor roadway) in Shenjian mine, Daizhuang, Shandong province. The roadway has been used for three years. Through being effect by three times of mining, but it has no obvious damage. This proves the reasonability of the design.